MTR Express Rail Ngau Tam Mei to Tai Kong Po Tunnels
- Client: Kier Kaden OSSA Joint Venture
- Value: HK$1.5 billion / US$190 million
About this Project
The Hong Kong to Guangzhou High Speed Rail Link is a 26km underground rail linking the new West Kowloon terminus to the mainland high speed rail network. The project comprised 2.6km of twin tunnels and a large cavern constructed by drill and blast between two access shafts, one 40m deep and the other 90m deep. The shafts would accommodate an emergency access to the tunnels as well as an operation building.
CDC provided contractual advice, claims management and claim preparation and negotiation support for the contractor in respect of its extension of time and additional payment entitlements throughout the construction period. CDC also provided delay analysis and independent technical advice for the project.
More Case Studies
Oceana Naval Air Station Runway and Lighting Repairs
CDC undertook a review of expected claim revenue on the project. This involved reviewing claim documentation, cost information, expert reports and DRB submissions and verifying the estimated recovery in line with the contract terms.
Trillium Line Extension
CDC were appointed by the design team to prepare a claim for late design approvals and client impacts to the design process.
Fullerton Hotel, Ocean Park, Hong Kong
CDC provided EOT claims preparation, contract advice and negotiation support to the contractor throughout the project construction. CDC also presented issues to the Client and architect to negotiate the EoT assessments during the course of the project.