CDC provided contractual advice, claims management and claims preparation to the international joint venture contractor for the project. The project comprises a high-level cable stayed bridge with two 150m tall towers supporting a 300m main span over the entrance to the Port of Long Beach California, two 500m backspans and 900m approach viaducts and will carry 15% of all goods coming into the USA.
Highways
Samuel de Champlain Bridge
CDC undertook a commercial claims review of the existing recovery strategy and advised the senior management on options to improve the Champlain Bridge project’s commercial position.
Stonecutters Bridge
Stonecutters Bridge is a 1,108m main span cable-stayed bridge over the entrance to Hong Kong’s container terminal (currently the third longest in the world). CDC acted for the contractor managing the complete commercial claims function throughout the construction.
Tseung Kwan O to Lam Tin Tunnel
CDC were appointed to prepare a strategy paper to identify recovery options for time and cost on the main tunnelling and lining works for the Tseung Kwan O to Lam Tin Tunnel project.
Tolo Highway Widening
CDC provided advice to the Contractor in relation to a dispute regarding contractual interpretation for formwork finishes on the Tolo Highway widening project. CDC advised on appointment of experts, presentation of the claim as well as drafting the statement of clam for a mediation hearing.
Ingiriya to Ratnapura Highway A8 Upgrade Sri Lanka
The project comprised the rehabilitation and improvement of 33km of road between Ingirya in Kalutara District of the Western Province and Ratnapura, the capital city of Sabaragamuwa Province.