CDC were appointed to prepare a strategy paper to identify recovery options for time and cost on the main tunnelling and lining works for the Tseung Kwan O to Lam Tin Tunnel project.
Tunnelling
Black Point Power Station
CDC provided claims and income management services to the civil works contractor for the Black Point Power Station Combined Cycle Gas Turbine project. The development is part of the Hong Kong government’s effort to replace older oil generation units with cleaner gas turbines to improve the territory’s air quality.
MTR Express Rail Ngau Tam Mei to Tai Kong Po Tunnels
CDC provided contractual advice, claims management and preparation and negotiation support for the contractor. The project comprises 2.6km of twin tunnels constructed by drill and blast between two access shafts, one 40m deep and the other 90m deep.
MTR South Island Line Lei Tung and South Horizons Stations and Tunnels
CDC prepared claims for delay, disruption and extensions of time on the station structure and shaft excavation works for the negotiation of a supplemental agreement. The project comprised cut and cover tunnels and station structure and cavern excavation.
Kennedy Town Station
CDC provided contractual and strategic advice, claims management and claim preparation for the Kennedy Town station construction project. The project comprised construction of an underground railway station and overrun tunnel in a congested urban environment.