Black Point Power Station, Hong Kong
- Client: Leighton Asia Limited
- Value: HK$790 million / US$101 million
About this Project
CDC provided claims and income management services to the civil works contractor for the Black Point Power Station Combined Cycle Gas Turbine project. The development is part of the Hong Kong government’s effort to replace older oil generation units with cleaner gas turbines to improve the territory’s air quality. The project involved construction of the power station’s foundations, structure, water supply and discharge culverts, water supply intake shafts and tunnels and MEP fit out for a new gas turbine.
Black Point Power Station, Hong Kong
CDC was responsible for particularising the extensions of time and additional payment claims in respect of the ELS works; TBM works; façade/cladding works; culvert works as well as MEP works. CDC assisted senior management to prepare presentations to the client for negotiation of the final account and was also responsible for providing contractual support in respect of sub-contract issues.
More Case Studies
Oceana Naval Air Station Runway and Lighting Repairs
CDC undertook a review of expected claim revenue on the project. This involved reviewing claim documentation, cost information, expert reports and DRB submissions and verifying the estimated recovery in line with the contract terms.
Trillium Line Extension
CDC were appointed by the design team to prepare a claim for late design approvals and client impacts to the design process.
Fullerton Hotel, Ocean Park, Hong Kong
CDC provided EOT claims preparation, contract advice and negotiation support to the contractor throughout the project construction. CDC also presented issues to the Client and architect to negotiate the EoT assessments during the course of the project.