Gerald Desmond Bridge, Long Beach, California

a high-level cable stayed bridge
  • Client: Shimmick – FCC – Impregilo Joint Venture
  • Value: US$700 million / HK$5.4 billion

About this Project

CDC provided contractual advice, claims management and claims preparation to the international joint venture contractor for the project. The project comprises a high-level cable stayed bridge with two 150m tall towers supporting a 300m main span over the entrance to the Port of Long Beach California, two 500m backspans and 900m approach viaducts and will carry 15% of all goods coming into the USA. The bridge was constructed under a design and build contract. CDC provided support to the project in relation to identifying, developing and drafting technical claims against the Client which were settled in DAB hearings and also provided support to the JV in a related subcontract mediation.

The Gerald Desmond Bridge under construction

More Case Studies

I-405 Improvement, Orange County, California

I-405 Improvement, Orange County, California

CDC undertook an independent review of expected claim revenue on the project. This involved reviewing claim documentation and cost information and verifying the estimated recovery in line with the contract terms.

read more