Lam Tin to Tseung Kwan O Tunnel, Hong Kong
- Client: Hong Kong Leighton China State Joint Venture
- Value: HK$8.73 billion / US$1.12 billion
About this Project
The Tseung Kwan O to Lam Tin Tunnel comprises the construction of a 2.2km long dual two-lane tunnel connecting Kwun Tong and Tseung Kwan O utilizing drill and blast and mechanical excavation techniques. The project also includes the construction of the Lam Tin interchange and administration buildings and bridges adjacent to the Tseung Kwan O portal. The project is a strategic part of the future Route 6 which will link Tseung Kwan O with West Kowloon via the Central Kowloon Route.
CDC were engaged to prepare a claim strategy paper to identify potential recovery options for time and cost on the main tunneling and lining works.





More Case Studies
The Hari Hotel, Wanchai, Hong Kong
CDC were engaged to assist with the strengthening and pursuit of EoT claims on the project. The submitted EOT claims were reviewed and an updated assessment of the critical path was prepared following completion of the works.
Power Transmission Platform, Hinkley Point C
CDC advised the contractor on a claim for delayed access to the Works and prepared a presentation in support of negotiations.
I-405 Improvement, Orange County, California
CDC undertook an independent review of expected claim revenue on the project. This involved reviewing claim documentation and cost information and verifying the estimated recovery in line with the contract terms.