LTA, Downtown Line 2, Singapore – Contract 916 Beautyworld Station and Tunnel Project
- Client: McConnel Dowell Pty
- Value: S$340 million / US$233 million
About this Project
Beautyworld station was part of the Downtown Line Stage 2 scheme, linking Bukit Timah Corridor to the North East Line, North South Line and Circle Lines.
The project comprised the design and construction of two MRT tunnels with a total length of 2,000m, a new underground station with entrances and external landscaping. The works required the use of two slurry TBMs, controlled blasting and the installation of secant bored piles.
CDC undertook a review of the GIBR contract provisions for the Contractor.

More Case Studies
Power Transmission Platform, Hinkley Point C
CDC advised the contractor on a claim for delayed access to the Works and prepared a presentation in support of negotiations.
I-405 Improvement, Orange County, California
CDC undertook an independent review of expected claim revenue on the project. This involved reviewing claim documentation and cost information and verifying the estimated recovery in line with the contract terms.
Oceana Naval Air Station Runway and Lighting Repairs
CDC undertook a review of expected claim revenue on the project. This involved reviewing claim documentation, cost information, expert reports and DRB submissions and verifying the estimated recovery in line with the contract terms.