MTR West Island Line, Kennedy Town Swimming Pool, Hong Kong
Re-provisioning of Kennedy Town Swimming Pool
- Client: Subconsultant for Paul Y Limited
About this Project
The project comprised the first phase of a new swimming pool construction as part of re-provisioning for construction of the Kennedy Town Station on the West Island Line extension. CDC prepared a claim for the Contractor regarding unforeseen ground conditions affecting the bored piling operation.
More Case Studies
Réseau express métropolitain (REM), Montreal, Quebec
The project is being undertaken on an Engineering Procurement Construction contract. CDC prepared a claim for the main design team joint venture (SNC-Lavalin AECOM Consultants) on the project.
French International School
CDC were appointed by the contractor to prepare a counterclaim in relation to issues arising during the project period and reviewing the client’s counter claim for alleged defects.
Multipurpose Building in Remaining Midfield Area
CDC was engaged to review and strengthen the Contractor’s EoT entitlement documents which included ground conditions issues, COVID and changes to design intent.