Oceana Naval Air Station Runway and Lighting Repairs, Oceana, Virginia
- Client: Lane Corporation
- Value: HK$522.6 million / US$67 million
About this Project
This project consists of the repair of Runway 14L-32R and associated electrical airfield lighting, as well as new, 4-foot-wide taxiway shoulders constructed in areas where the edge lighting systems are being modified. The project also involves replacement of the arresting gear pavement protection system, and rehabilitation and widening of the asphalt concrete pavement around the arresting gear (A/G) equipment, tape wedges, and access roads.
CDC undertook a review of expected claim revenue on the project. This involved reviewing claim documentation, cost information, expert reports and DRB submissions and verifying the estimated recovery in line with the contract terms.
More Case Studies
Trillium Line Extension
CDC were appointed by the design team to prepare a claim for late design approvals and client impacts to the design process.
Fullerton Hotel, Ocean Park, Hong Kong
CDC provided EOT claims preparation, contract advice and negotiation support to the contractor throughout the project construction. CDC also presented issues to the Client and architect to negotiate the EoT assessments during the course of the project.
MTRC Shatin Central Link – Contract 1123, Exhibition Station and Western Approach Tunnel
CDC provided claims preparation and negotiation support to the contractor on this target cost contract, part of the Shatin to Central Link Project – North South Line. The North South Line (NSL) is a 6km extension from Hung Hom Station across the harbour to Hong Kong Island with two new stations at Exhibition and Admiralty