Trillium Line Extension, Ottawa Stage 2 LRT Project, Canada
- Client: SNC-Lavalin (Pacific) Inc.
- Value: CAD$1.6 billion / US$1.2 billion
About this Project
The Trillium Line Extension is a CAD1.6 billion PPP light rail project in Ottawa. Under the project, SNC Lavalin provide financing, design, construction and maintenance for the project. The CAD663m (HK$3.7b) construction project involves:
- Construction of two new stations and the extension of five station platforms on the existing Trillium Line to accommodate longer trains with additional capacity.
- Four new stations along the new extension and two new stations along the 4-kilometre Airport Link (16km of track in total).
- Construction of a new Maintenance and Storage Facility (MSF).
- Delivery of new municipal infrastructure, including two new pedestrian bridges to improve connectivity along the alignment through multiuse pathways (MUPs).
- Maintenance of both the existing Trillium Line and the extension for 27 years.
- Refurbishment of existing rolling stock and provision of seven new trains.
CDC were appointed by the design team to prepare a claim for late design approvals and client impacts to the design process.
More Case Studies
Fullerton Hotel, Ocean Park, Hong Kong
CDC provided EOT claims preparation, contract advice and negotiation support to the contractor throughout the project construction. CDC also presented issues to the Client and architect to negotiate the EoT assessments during the course of the project.
MTRC Shatin Central Link – Contract 1123, Exhibition Station and Western Approach Tunnel
CDC provided claims preparation and negotiation support to the contractor on this target cost contract, part of the Shatin to Central Link Project – North South Line. The North South Line (NSL) is a 6km extension from Hung Hom Station across the harbour to Hong Kong Island with two new stations at Exhibition and Admiralty
Hong Kong International Airport, Gate Transformation at Terminals
CDC were appointed by the Contractor to review various issues on design liability and various other contractual issues during the currency of the project.