WSD Pressure Management and District Monitoring System
- Client: Gammon Construction Limited
- Value: HK$240 million / US$30 million
About this Project
The project comprised a term contract for installation of flowmeters and valves into the existing water supply network in Kowloon and Hong Kong Island. CDC provided advice to the Contractor in relation to a dispute arising from measurement issues on the contract. CDC also prepared the position paper for mediation and advised the Contractor on negotiating with the client to resolve the commercial issues. The issues were ultimately resolved through negotiation.
More Case Studies
Fullerton Hotel, Ocean Park, Hong Kong
CDC provided EOT claims preparation, contract advice and negotiation support to the contractor throughout the project construction. CDC also presented issues to the Client and architect to negotiate the EoT assessments during the course of the project.
MTRC Shatin Central Link – Contract 1123, Exhibition Station and Western Approach Tunnel
CDC provided claims preparation and negotiation support to the contractor on this target cost contract, part of the Shatin to Central Link Project – North South Line. The North South Line (NSL) is a 6km extension from Hung Hom Station across the harbour to Hong Kong Island with two new stations at Exhibition and Admiralty
Hong Kong International Airport, Gate Transformation at Terminals
CDC were appointed by the Contractor to review various issues on design liability and various other contractual issues during the currency of the project.