MTR South Island Line Ocean Park and Wong Chuk Hang Stations, Hong Kong
MTR South Island Line – Ocean Park Station, Wong Chuk Hang Station, Viaduct and Aberdeen Channel Bridge
- Client: Leighton Contractors Asia Limited
- Value: HK$2.5 billion / US$318 million
About this Project
South Island Line East is a 7km long medium capacity railway connecting Admiralty Station to the Southern District of Hong Kong. The 903 project included the construction of two elevated MTR stations at Ocean Park and Wong Chuk Hang, 2.1km of viaducts and a 246m bridge across the Aberdeen Channel. The project was undertaken under on a target cost contract.
CDC prepared claims and position papers for the contractor in relation to securing increases of the target cost.
More Case Studies
Oceana Naval Air Station Runway and Lighting Repairs
CDC undertook a review of expected claim revenue on the project. This involved reviewing claim documentation, cost information, expert reports and DRB submissions and verifying the estimated recovery in line with the contract terms.
Trillium Line Extension
CDC were appointed by the design team to prepare a claim for late design approvals and client impacts to the design process.
Fullerton Hotel, Ocean Park, Hong Kong
CDC provided EOT claims preparation, contract advice and negotiation support to the contractor throughout the project construction. CDC also presented issues to the Client and architect to negotiate the EoT assessments during the course of the project.