MTR South Island Line Ocean Park and Wong Chuk Hang Stations, Hong Kong
MTR South Island Line – Ocean Park Station, Wong Chuk Hang Station, Viaduct and Aberdeen Channel Bridge
- Client: Leighton Contractors Asia Limited
- Value: HK$2.5 billion / US$318 million
About this Project
South Island Line East is a 7km long medium capacity railway connecting Admiralty Station to the Southern District of Hong Kong. The 903 project included the construction of two elevated MTR stations at Ocean Park and Wong Chuk Hang, 2.1km of viaducts and a 246m bridge across the Aberdeen Channel. The project was undertaken under on a target cost contract.
CDC prepared claims and position papers for the contractor in relation to securing increases of the target cost.
More Case Studies
Réseau express métropolitain (REM), Montreal, Quebec
The project is being undertaken on an Engineering Procurement Construction contract. CDC prepared a claim for the main design team joint venture (SNC-Lavalin AECOM Consultants) on the project.
French International School
CDC were appointed by the contractor to prepare a counterclaim in relation to issues arising during the project period and reviewing the client’s counter claim for alleged defects.
Multipurpose Building in Remaining Midfield Area
CDC was engaged to review and strengthen the Contractor’s EoT entitlement documents which included ground conditions issues, COVID and changes to design intent.