Multipurpose Building in Remaining Midfield Area
Hong Kong International Airport
- Client: Paul Y Construction Company Ltd
- Value: HK$602 million / US$77m
About this Project
The contract involves the design and construction of a multipurpose building in the Midfield Area of the Hong Kong International Airport. CDC was engaged to review and strengthen the Contractor’s EoT entitlement documents which included ground conditions issues, COVID and changes to design intent.
More Case Studies
Advanced Manufacturing Centre
CDC were appointed to review, research and strengthen EOT claim particulars on the building construction and the associated seawater district cooling system, prepare presentations and provide contractual advice.
Central Kowloon Route – Kai Tak West
CDC prepared claims in relation to delays to the construction of the main access shaft to the works in Ma Tau Kok and to review issues on disposal of spoil.
The Hari Hotel, Wanchai, Hong Kong
CDC were engaged to assist with the strengthening and pursuit of EoT claims on the project. The submitted EOT claims were reviewed and an updated assessment of the critical path was prepared following completion of the works.