Multipurpose Building in Remaining Midfield Area
Hong Kong International Airport
- Client: Paul Y Construction Company Ltd
- Value: HK$602 million / US$77m
About this Project
The contract involves the design and construction of a multipurpose building in the Midfield Area of the Hong Kong International Airport. CDC was engaged to review and strengthen the Contractor’s EoT entitlement documents which included ground conditions issues, COVID and changes to design intent.
More Case Studies
Réseau express métropolitain (REM), Montreal, Quebec
The project is being undertaken on an Engineering Procurement Construction contract. CDC prepared a claim for the main design team joint venture (SNC-Lavalin AECOM Consultants) on the project.
French International School
CDC were appointed by the contractor to prepare a counterclaim in relation to issues arising during the project period and reviewing the client’s counter claim for alleged defects.
Advanced Manufacturing Centre
CDC were appointed to review, research and strengthen EOT claim particulars on the building construction and the associated seawater district cooling system, prepare presentations and provide contractual advice.


