Multipurpose Building in Remaining Midfield Area

Hong Kong International Airport

  • Client: Paul Y Construction Company Ltd
  • Value: HK$602 million / US$77m

About this Project

The contract involves the design and construction of a multipurpose building in the Midfield Area of the Hong Kong International Airport. CDC was engaged to review and strengthen the Contractor’s EoT entitlement documents which included ground conditions issues, COVID and changes to design intent.

More Case Studies

French International School

French International School

CDC were appointed by the contractor to prepare a counterclaim in relation to issues arising during the project period and reviewing the client’s counter claim for alleged defects.

read more
Advanced Manufacturing Centre

Advanced Manufacturing Centre

CDC were appointed to review, research and strengthen EOT claim particulars on the building construction and the associated seawater district cooling system, prepare presentations and provide contractual advice.

read more