Hong Kong International Airport, Third Runway Reclamation Works
- Client: T & M Specialists Limited
- Value: HK$10 million
About this Project
CDC was appointed to provide a contract review with regard to a subcontractor undertaking ground stabilisation to the new third runway reclamation works following termination of the subcontract. CDC reviewed the various issues and assisted in drafting correspondence to assist the subcontractor in pursuing its monetary claims. CDC also provided advice to the subcontractor on strategies related to dispute resolution. The issues were resolved through negotiation by the parties.
More Case Studies
Réseau express métropolitain (REM), Montreal, Quebec
The project is being undertaken on an Engineering Procurement Construction contract. CDC prepared a claim for the main design team joint venture (SNC-Lavalin AECOM Consultants) on the project.
French International School
CDC were appointed by the contractor to prepare a counterclaim in relation to issues arising during the project period and reviewing the client’s counter claim for alleged defects.
Multipurpose Building in Remaining Midfield Area
CDC was engaged to review and strengthen the Contractor’s EoT entitlement documents which included ground conditions issues, COVID and changes to design intent.


