Hong Kong International Airport, Gate Transformation at Terminals
- Client: Union Contractors Limited
- Value: HK$500 million / US$64 million
About this Project
This project involves the refurbishment and upgrading of 49 boarding gates in the existing airport terminal buildings (Terminal 1, Midfield Concourse and Northern Satellite Concourse) at the interface between the main terminal building and the air bridges. A&A Works at the concourse included boarding gates, service desks, binnacles, flight information displays, water zone, and retail cabins. CDC were appointed by the Contractor to review various issues on design liability and various other contractual issues during the currency of the project.
More Case Studies
Oceana Naval Air Station Runway and Lighting Repairs
CDC undertook a review of expected claim revenue on the project. This involved reviewing claim documentation, cost information, expert reports and DRB submissions and verifying the estimated recovery in line with the contract terms.
Trillium Line Extension
CDC were appointed by the design team to prepare a claim for late design approvals and client impacts to the design process.
Fullerton Hotel, Ocean Park, Hong Kong
CDC provided EOT claims preparation, contract advice and negotiation support to the contractor throughout the project construction. CDC also presented issues to the Client and architect to negotiate the EoT assessments during the course of the project.