MTRC Shatin Central Link – Contract 1123
Exhibition Station and Western Approach Tunnel
- Client: Leighton China State Joint Venture
- Value: HK$5.8 billion / US$740 million
About this Project
CDC provided claims preparation and negotiation support to the contractor on this target cost contract, part of the Shatin to Central Link Project – North South Line.
The North South Line (NSL) is a 6km extension from Hung Hom Station across the harbour to Hong Kong Island with two new stations at Exhibition and Admiralty. The Works under 1123 comprises the Permanent Works and associated Temporary Works required for the construction of Exhibition station, a 300m section of cut and cover tunnels to the West of the station (providing for both SCL and the future North Island Line tracks), the related adits and entrances, ventilation shafts; and the CEDD Entrusted Works.


The construction of the 300m long cut and cover tunnel and underground station in one of the busiest areas of the Wanchai business district in close proximity to and beneath the main exhibition and conference centre posed significant logistical and sequencing challenges. The project was also impacted by civil unrest and unexploded WW2 ordinance.
CDC led the claims team of JV and CDC staff throughout the five year construction period, provided contractual advice to senior management, claim identification and drafting services, negotiated with the employer on extension of time issues and provided negotiation support to senior management on cost issues. The assignment concluded shortly after station opening with all major extension of time issues successfully closed out avoiding major disputes.

Brian Shepstone, Leighton China State JV Project Director commented “CDC integrated into the project team seamlessly and provided over 5 years of excellent and reliable support and advice to both the operation and commercial teams. CDC’s strength lies in their ability to understand the technical, programming and commercial issues at hand and provide strong arguments to support the JV’s contractual position in respect of the diverse number of events which affected the project.”


More Case Studies
The Hari Hotel, Wanchai, Hong Kong
CDC were engaged to assist with the strengthening and pursuit of EoT claims on the project. The submitted EOT claims were reviewed and an updated assessment of the critical path was prepared following completion of the works.
Power Transmission Platform, Hinkley Point C
CDC advised the contractor on a claim for delayed access to the Works and prepared a presentation in support of negotiations.
I-405 Improvement, Orange County, California
CDC undertook an independent review of expected claim revenue on the project. This involved reviewing claim documentation and cost information and verifying the estimated recovery in line with the contract terms.