LTA, Downtown Line 2, Singapore – Contract 916 Beautyworld Station and Tunnel Project
- Client: McConnel Dowell Pty
- Value: S$340 million / US$233 million
About this Project
Beautyworld station was part of the Downtown Line Stage 2 scheme, linking Bukit Timah Corridor to the North East Line, North South Line and Circle Lines.
The project comprised the design and construction of two MRT tunnels with a total length of 2,000m, a new underground station with entrances and external landscaping. The works required the use of two slurry TBMs, controlled blasting and the installation of secant bored piles.
CDC undertook a review of the GIBR contract provisions for the Contractor.
More Case Studies
Réseau express métropolitain (REM), Montreal, Quebec
The project is being undertaken on an Engineering Procurement Construction contract. CDC prepared a claim for the main design team joint venture (SNC-Lavalin AECOM Consultants) on the project.
French International School
CDC were appointed by the contractor to prepare a counterclaim in relation to issues arising during the project period and reviewing the client’s counter claim for alleged defects.
Multipurpose Building in Remaining Midfield Area
CDC was engaged to review and strengthen the Contractor’s EoT entitlement documents which included ground conditions issues, COVID and changes to design intent.