Advanced Manufacturing Centre, Hong Kong
- Client:Gammon Construction Limited
- Value:HK$4.75 billion / US$608m
About this Project
Located in Tseung Kwan O Industrial Estate, the project mainly involves the construction of a 9-storey building with a 2-storey basement, providing 108,000 sq.m of space enabling companies of all sizes to engage in highly customised production for high value-added but low-volume technology innovations. The project provides advanced and scalable manufacturing facilities indicative of the “Re-industrialisation of Hong Kong.” AMC provides dedicated logistics, warehousing, prototyping and cleanroom services. It also includes a footbridge connecting the Data Technology Hub of the adjacent site and a seawater district cooling system.
CDC were appointed to review, research and strengthen EOT claim particulars on the building construction and the associated seawater district cooling system, prepare presentations and provide contractual advice.
More Case Studies
Réseau express métropolitain (REM), Montreal, Quebec
The project is being undertaken on an Engineering Procurement Construction contract. CDC prepared a claim for the main design team joint venture (SNC-Lavalin AECOM Consultants) on the project.
French International School
CDC were appointed by the contractor to prepare a counterclaim in relation to issues arising during the project period and reviewing the client’s counter claim for alleged defects.
Multipurpose Building in Remaining Midfield Area
CDC was engaged to review and strengthen the Contractor’s EoT entitlement documents which included ground conditions issues, COVID and changes to design intent.