Central Kowloon Route – Kai Tak West, Hong Kong
- Client: Gammon Construction
- Value: HK$6 billion / US$768 million
About this Project
The contract forms a part of the overall Central Kowloon Route, a 4.7km-long dual three-lane strategic tunnelled trunk road in linking Kai Tak with Yau Ma Tei in Central Kowloon that will relieve congestion in Central Kowloon’s road network.
The project involves the construction of a 370m-long underwater tunnel and the associated temporary reclamation in Kowloon Bay of about 3 hectares, a 160m-long cut and cover tunnel in Ma Tau Kok as well as a 125m-long depressed road and 170m-long underpass in the Kai Tak Development.
CDC prepared claims in relation to delays to the construction of the main access shaft to the works in Ma Tau Kok and to review issues on disposal of spoil.
More Case Studies
Réseau express métropolitain (REM), Montreal, Quebec
The project is being undertaken on an Engineering Procurement Construction contract. CDC prepared a claim for the main design team joint venture (SNC-Lavalin AECOM Consultants) on the project.
French International School
CDC were appointed by the contractor to prepare a counterclaim in relation to issues arising during the project period and reviewing the client’s counter claim for alleged defects.
Multipurpose Building in Remaining Midfield Area
CDC was engaged to review and strengthen the Contractor’s EoT entitlement documents which included ground conditions issues, COVID and changes to design intent.