Gerald Desmond Bridge, Long Beach, California

a high-level cable stayed bridge
  • Client: Shimmick – FCC – Impregilo Joint Venture
  • Value: US$700 million / HK$5.4 billion

About this Project

CDC provided contractual advice, claims management and claims preparation to the international joint venture contractor for the project. The project comprises a high-level cable stayed bridge with two 150m tall towers supporting a 300m main span over the entrance to the Port of Long Beach California, two 500m backspans and 900m approach viaducts and will carry 15% of all goods coming into the USA. The bridge was constructed under a design and build contract. CDC provided support to the project in relation to identifying, developing and drafting technical claims against the Client which were settled in DAB hearings and also provided support to the JV in a related subcontract mediation.

The Gerald Desmond Bridge under construction

More Case Studies

Tuen Mun Columbarium and Garden of Remembrance

Tuen Mun Columbarium and Garden of Remembrance

CDC was appointed to provide claims recovery and income management services to the contractor for the Tuen Mun columbarium. The columbarium will help to alleviate the acute shortage of burial space in Hong Kong by providing 160,000 niches in an eight-storey columbarium building along with a 4,800 square metre Garden of Remembrance.

read more
East Kowloon Cultural Centre, Hong Kong

East Kowloon Cultural Centre, Hong Kong

The East Kowloon Cultural Centre consists of a three-storey building housing three studios with capacities ranging between 120 and 250 seats, a 1,200-capacity auditorium, 550-seat theatre and under stage area, semi-basement areas for plant rooms, and other ancillary facilities. The project also houses a large rehearsal room, two connectable rehearsal rooms and a restaurant.

read more