Gerald Desmond Bridge, Long Beach, California

a high-level cable stayed bridge
  • Client: Shimmick – FCC – Impregilo Joint Venture
  • Value: US$700 million / HK$5.4 billion

About this Project

CDC provided contractual advice, claims management and claims preparation to the international joint venture contractor for the project. The project comprises a high-level cable stayed bridge with two 150m tall towers supporting a 300m main span over the entrance to the Port of Long Beach California, two 500m backspans and 900m approach viaducts and will carry 15% of all goods coming into the USA. The bridge was constructed under a design and build contract. CDC provided support to the project in relation to identifying, developing and drafting technical claims against the Client which were settled in DAB hearings and also provided support to the JV in a related subcontract mediation.

The Gerald Desmond Bridge under construction

More Case Studies

East Kowloon Cultural Centre, Hong Kong

East Kowloon Cultural Centre, Hong Kong

The project comprises construction of the signature Express Rail Terminus in Kowloon. CDC is providing ongoing contractual advice, claims management, preparation and negotiation for several packages of work under the JV agreement and delay analysis and programme support to the Contractor.

read more
Urban Renewal Project

Urban Renewal Project

CDC provided claims and delay analysis advice to the project team to strengthen the negotiation position for the project. The project comprises the construction of two towers with a total of 493 residential flats on a three-storey podium.

read more