MTR Express Rail Ngau Tam Mei to Tai Kong Po Tunnels
- Client: Kier Kaden OSSA Joint Venture
- Value: HK$1.5 billion / US$190 million
About this Project
The Hong Kong to Guangzhou High Speed Rail Link is a 26km underground rail linking the new West Kowloon terminus to the mainland high speed rail network. The project comprised 2.6km of twin tunnels and a large cavern constructed by drill and blast between two access shafts, one 40m deep and the other 90m deep. The shafts would accommodate an emergency access to the tunnels as well as an operation building.
CDC provided contractual advice, claims management and claim preparation and negotiation support for the contractor in respect of its extension of time and additional payment entitlements throughout the construction period. CDC also provided delay analysis and independent technical advice for the project.
More Case Studies
Fullerton Hotel, Ocean Park, Hong Kong
CDC provided EOT claims preparation, contract advice and negotiation support to the contractor throughout the project construction. CDC also presented issues to the Client and architect to negotiate the EoT assessments during the course of the project.
MTRC Shatin Central Link – Contract 1123, Exhibition Station and Western Approach Tunnel
CDC provided claims preparation and negotiation support to the contractor on this target cost contract, part of the Shatin to Central Link Project – North South Line. The North South Line (NSL) is a 6km extension from Hung Hom Station across the harbour to Hong Kong Island with two new stations at Exhibition and Admiralty
Hong Kong International Airport, Gate Transformation at Terminals
CDC were appointed by the Contractor to review various issues on design liability and various other contractual issues during the currency of the project.