MTR Express Rail Ngau Tam Mei to Tai Kong Po Tunnels
- Client: Kier Kaden OSSA Joint Venture
- Value: HK$1.5 billion / US$190 million
About this Project
The Hong Kong to Guangzhou High Speed Rail Link is a 26km underground rail linking the new West Kowloon terminus to the mainland high speed rail network. The project comprised 2.6km of twin tunnels and a large cavern constructed by drill and blast between two access shafts, one 40m deep and the other 90m deep. The shafts would accommodate an emergency access to the tunnels as well as an operation building.
CDC provided contractual advice, claims management and claim preparation and negotiation support for the contractor in respect of its extension of time and additional payment entitlements throughout the construction period. CDC also provided delay analysis and independent technical advice for the project.




More Case Studies
Harbour Area Treatment Scheme Stage 2
The project comprised the construction of a 12km long sewage conveyance system from North Point Preliminary Treatment Works to Stonecutters Island Sewage Treatment Works.
WSD Pressure Management and District Monitoring System
The project comprised a term contract for installation of flowmeters and valves into the existing water supply network in Kowloon and Hong Kong Island.
Ingiriya to Ratnapura Highway A8 Upgrade Sri Lanka
The project comprised the rehabilitation and improvement of 33km of road between Ingirya in Kalutara District of the Western Province and Ratnapura, the capital city of Sabaragamuwa Province.